Prime Contractor for the Lighting Protection Project at the Chicago Harbor Lock, Chicago IL.  Work consisted of all necessary facilities, plants, labor, transportation, materials, and equipment to provide and install a Lighting Protection System.  Installation included new Lighting protection equipment and cable on the Lock and support buildings as well as modifications to an existing lighting protection system at the main control building.  Worked closing with Army Corps of Engineers - Chicago District to assure the project was completed in accordance with the plans and specs and met all of the Corps' needs.  Project completed June 2015.