Prime Contractor for the replacement of (2) floor mount ventilators for the U.S. General Services Administration at the Customhouse, Pembina, ND.  Work consisted of the removal of old units and replacement with (2) new floor mount ventilators and (2) insulated low leak thermal break fresh air louver/damper assemblies to interlock with ventilator operation.  All equipment was set up to be controlled by the existing building automation system.  Project completed in April 2015.  

Pembina, ND